- MESLine 2 OEE: -8 points over the last 2 weeks
- Machine logMixer: non-standard +12 °C temperature swing
- ExcelScrap sheet: Line 2 scrap +120% on B-shift
- WhatsAppMaintenance group: '6 unscheduled Line 2 stops'
Line 2 is failing. The cause is in the machine logs and shift leads' chats, not in the ERP report.
Preventive maintenance on the Line 2 mixer within 48h. Recover 5-6 OEE points in 30 days.